The main bridge adopts a cable-stayed bridge with a low tower spanning the river. The span is (64+86) m+400m+(64+86) m=700m, and the full bridge width is 29m. After completion, it will become the world's tower cable-stayed bridge.

Zindn shield products are used for anticorrosion of the outer surface of steel box beams, guardrails and anti-collision guardrails, steel-concrete joints.


Hotline
Industrial coatings
Engineering case
Contact us