Offshore platform (atmosphere)
Serial numberPainting procedurePaint nameNo. of paintingAverage film thickness um/channel (dry film)Thinner
1Surface treatmentSandblasting
2PrimerWater-based cold spray zinc primer280Neutral water
3Intermediate paintWaterborne epoxy cloud iron intermediate paint2160
4TopcoatWaterborne two-component fluorocarbon topcoat280
Description:1、If the local rust is serious, it must be polished and pretreated with rust repair paint, and then the above supporting system.
2、Acid-resistant topcoat is available in areas with acid mist.
3、According to the environmental conditions in each region, negotiate with Party A to resolve.
Hotline
Industrial coatings
Engineering case
Contact us